HYACape Cod Gateway Airport 🇺🇸

HYA / KHYA · Hyannis, Massachusetts · USA

Environmental review
Project type
Replacement
Strength of evidence
Year
2027
Project intelligenceWhere the project stands in the process, based on the source's own status
Identified
Planning
Funded
Procurement
Under construction
Completed
What's happening now

EMAS reconstruction

Why RWI is watching this: Relevant EMAS activity exists, but commercial timing or maturity is still uncertain.

Runways
15/336/24
Documented EMAS

2 installations · EMASMAX · Runway 24

Installed 2003

Runway 6 FAA NASR current presence

Physical location per FAA NASR: runway 24. NASR cycle 2026-08-06. This record describes runway-end presence, not project status or physical history.

EMAS installation (2)
EMASMAX Runway 24 Current physical state
Source
FAA EMAS Incidents and Installations map (verified CSV export)
Federal Aviation Administration · FAA map data
Open source →
Details from the source

FAA map region: Map - Main

EMASMAX No confirmed runway link Installed 2003
Source
Fact Sheet – Engineered Material Arresting System (EMAS)
FAA · FAA fact sheet · 2016-02-04
Open source →
Details from the source

1 system. Bekraftat av bade 2011- och 2016-Fact Sheet (bada 'Barnstable Municipal, Hyannis, MA, 1, 2003'), ingen andring mellan utgavorna. Detta ar den ursprungliga installationen - var egen tidigare research tyder pa en senare ersattning runt 2023-2025, vilket ligger efter bada dessa ogonblicksbilder.

Location
Cape Cod Gateway Airport: 41.6693, -70.2804

41.6693, -70.2804

Projects and watch items
SignalLifecycleStatusProject typeConfidenceYearSourceScore
EMAS reconstruction Developing watch Environmental reviewReplacement2027 Other source 7.0
Funding and grants (1)

USAspending grant — $5.7M, FY2022 Needs research Watch item – research candidate · 8.0

Intelligence historyReal, source-backed project and funding events in chronological order - never an assumed causal link between entries
2022
Funding · Watch item – research candidate Needs research

Grant: $5,681,743 · A grant amount does not automatically indicate an EMAS contract value, a vendor's revenue, a total project cost, or a completed procurement - see "Estimated EMAS share" on the signal's own page for what is actually established.

Open source →

2027
EMAS reconstruction Replacement
Project · Environmental review Developing watch

Open source →

Evidence 4 sources

Source-backed, but no reviewed claim has been transcribed yet for the sources below - see each one's own link to the original source.

Final Environmental Assessment
Cape Cod Gateway Airport · Other source · 2025-11-04 · Open source →
USAspending grant: Barnstable Municipal Airport
Department of Transportation · USAspending grant · 2022-09-23 · Open source →
Fact Sheet – Engineered Material Arresting System (EMAS)
FAA · FAA fact sheet · 2016-02-04 · Open source →
FAA EMAS Incidents and Installations map (verified CSV export)
Federal Aviation Administration · FAA map data · Open source →