HYA Cape Cod Gateway Airport

USAspending grant — $5.7M, FY2022

Needs research Watch item – research candidate

A source-backed watch item, not confirmation of an active project or current physical installation.

Project type: Replacement
8.0
Details
Lifecycle
Needs research
Old enough that treating it as current would be misleading, but RWI has no evidence yet of what happened since. Not discarded - just unconfirmed.
Status
Watch item – research candidate
Project type
Replacement
Confidence
Planning year
2022
Procurement year
Runway
Likely supplier
Not assessed
Reasoning
Source

USAspending grant: Barnstable Municipal Airport

Department of Transportation · USAspending grant

Last verified source: 2022-09-23

Open source →
Details from the source Free text (cost, date, etc.) without its own database fields

PURPOSE: RECONSTRUCT RUNWAY. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 4,700 FEET OF RUNWAY 6/24 TO MAINTAIN THE STRUCTURAL INTEGRITY OF THE PAVEMENT AND TO MINIMIZE FOREIGN OBJECT DEBRIS. THIS GRANT FUNDS THE SECOND PHASE, WHICH CONSISTS OF REPLACING THE ENGINEERED MATERIAL ARRESTING SYSTEM ON THE RUNWAY 24 END. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH HYANNIS, MASSACHUSETTS.

Economics
Grant amount
$5,681,743
A grant amount does not automatically indicate an EMAS contract value, a vendor's revenue, a total project cost, or a completed procurement - see "Estimated EMAS share" on the signal's own page for what is actually established.
Estimated EMAS share