BGM Greater Binghamton Airport

USAspending grant — $5.4M, FY2023

Needs research Watch item – research candidate

A source-backed watch item, not confirmation of an active project or current physical installation.

Project type: Replacement
8.0
Details
Lifecycle
Needs research
Old enough that treating it as current would be misleading, but RWI has no evidence yet of what happened since. Not discarded - just unconfirmed.
Status
Watch item – research candidate
Project type
Replacement
Confidence
Planning year
2023
Procurement year
Runway
Likely supplier
Not assessed
Reasoning
Source

USAspending grant: Broome County

Department of Transportation · USAspending grant

Last verified source: 2023-08-23

Open source →
Details from the source Free text (cost, date, etc.) without its own database fields

PURPOSE: CONSTRUCT/EXTEND/IMPROVE SAFETY AREA. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REPLACES THE ENGINEERED MATERIAL ARRESTING SYSTEM AT THE 14 CFR PART 139 CERTIFICATED RUNWAY 34 END TO MEET RUNWAY SAFETY AREA STANDARDS. . THIS GRANT FUNDS THE SECOND PHASE, WHICH CONSISTS OF BLOCK PROCUREMENT OF THE ENGINEERED MATERIAL ARRESTING SYSTEM. THE FAA WORKED WITH THE NATION'S 14 CFR PART 139 CERTIFICATED AIRPORTS TO COMPLETE ALL PRACTICABLE IMPROVEMENTS TO RUNWAY SAFETY AREAS PRIOR TO THE DEADLINE OF DECEMBER 31, 2015. HOWEVER, SOME AIRPORTS, INCLUDING THIS ONE, CONTINUE TO PURSUE FURTHER IMPROVEMENTS AS THEY BECOME FEASIBLE. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH BINGHAMTON, NEW YORK. [2026-07-26] Korsreferens: motsvarar troligen AMPU:s 'Runway 16 EMAS – Construction Phase I' ($7,425M totalt, $6,683M FAA-andel, 2023-2028) - detta FY2023-belopp är den största av tre FY2023-poster som tillsammans ($5,4M+$1,6M+$1,0M=$8,0M) ligger nära Phase I:s totalkostnad. Källa: https://binghamtonairport.com/wp-content/uploads/2023/01/8-BGM-AMPU-Financial-Feasibility.pdf

Economics
Grant amount
$5,402,598
A grant amount does not automatically indicate an EMAS contract value, a vendor's revenue, a total project cost, or a completed procurement - see "Estimated EMAS share" on the signal's own page for what is actually established.
Estimated EMAS share