ORH Worcester Regional

USAspending grant — $6.3M, FY2025

identified Ersättning
8.0
Detaljer
Kategori
Ersättning
Status
identified
Confidence
Planeringsår
2025
Upphandlingsår
Bana
Trolig leverantör
Inte bedömd
Motivering
Källa

USAspending grant: Massachusetts Port Authority

Department of Transportation · USAspending-bidrag

Öppna källa →
Detaljer från källan Fritext (kostnad, datum m.m.) utan egna fält i databasen

PURPOSE: CONSTRUCT/EXTEND/IMPROVE SAFETY AREA. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT REPLACES AN ENGINEERED MATERIAL ARRESTING SYSTEM THAT HAS EXCEEDED ITS USEFUL LIFE AT THE 14 CFR PART 139 CERTIFICATED RUNWAY 11 AND 29 DEPARTURE ENDS TO MEET RUNWAY SAFETY AREA STANDARDS. THIS GRANT FUNDS A PORTION OF PHASE 2, WHICH CONSISTS OF REPLACING THE ENGINEERED MATERIAL ARRESTING SYSTEM FOR RUNWAY 29 DEPARTURE END. THIS GRANT IS ASSOCIATED WITH AN INFRASTRUCTURE INVESTMENT JOBS ACT LAW AIRPORT GRANT THAT FUNDS THE REMAINING ELIGIBLE PORTION OF THE PROJECT. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH WORCESTER, MASSACHUSETTS.

Ekonomi
Total projektbudget
$6,292,342
Bedömd EMAS-del