MSP Minneapolis St. Paul International

USAspending grant — $9.2M, FY2025

identified Ersättning
8.0
Detaljer
Kategori
Ersättning
Status
identified
Confidence
Planeringsår
2025
Upphandlingsår
Bana
Trolig leverantör
Inte bedömd
Motivering
Källa

USAspending grant: Metropolitan Airports Commission

Department of Transportation · USAspending-bidrag

Öppna källa →
Detaljer från källan Fritext (kostnad, datum m.m.) utan egna fält i databasen

PURPOSE: RECONSTRUCT TAXIWAY; RECONSTRUCT ENGINEERED MATERIAL ARRESTING SYSTEM SAFETY AREA. ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT RECONSTRUCTS 6,000 FEET OF THE EXISTING PAVED TAXIWAY B PAVEMENT THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS PROJECT RECONSTRUCTS EXISTING RUNWAY 12R/30L ENGINEERED MATERIAL ARRESTING SYSTEM SAFETY AREA AT THE RUNWAY 12R END THAT HAS REACHED THE END OF ITS USEFUL LIFE. THIS GRANT FUNDS PHASE 3, WHICH CONSISTS OF RECONSTRUCTION OF 475 FEET. INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH MINNEAPOLIS, MINNESOTA.

Ekonomi
Total projektbudget
$9,196,060
Bedömd EMAS-del