GMU Greenville Downtown

USAspending grant — $8.3M, FY2022

identified Ny installation
8.0
Detaljer
Kategori
Ny installation
Status
identified
Confidence
Planeringsår
2022
Upphandlingsår
Bana
Trolig leverantör
Inte bedömd
Motivering
Källa

USAspending grant: Greenville Airport Commission

Department of Transportation · USAspending-bidrag

Öppna källa →
Detaljer från källan Fritext (kostnad, datum m.m.) utan egna fält i databasen

PURPOSE: CONSTRUCT/EXTEND/IMPROVE SAFETY AREA. THIS GRANT IS FUNDED BY THE CORONAVIRUS AID, RELIEF, AND ECONOMIC SECURITY ACT TO INCREASE THE FEDERAL SHARE TO 100 PERCENT FOR THE AIRPORT IMPROVEMENT PROGRAM (AIP). ACTIVITIES TO BE PERFORMED/EXPECTED OUTCOMES: THIS PROJECT EXTENDS THE RUNWAY 1/19 SAFETY AREAS TO 600 FEET TO MEET FEDERAL AVIATION ADMINISTRATION DESIGN STANDARDS. THIS IMPROVEMENT WILL ENHANCE SAFETY AT THE AIRPORT. THIS GRANT FUNDS THE SECOND PHASE, WHICH CONSISTS OF DESIGN AND CONSTRUCTION OF THE RUNWAY 1 ENGINEERED MATERIAL ARRESTING SYSTEM (EMAS). INTENDED BENEFICIARY: THIS GRANT WILL PROVIDE FEDERAL FUNDING FOR AIRPORTS ASSOCIATED WITH GREENVILLE, SOUTH CAROLINA.

Ekonomi
Total projektbudget
$8,326,617
Bedömd EMAS-del